Rent and Sell 1000V Lightning Counter Tester Manufacturer Supply Usage Method:
.1. Charge before use. To ensure charging effect and extend battery life, use the dedicated charger. It takes 3-4 hours to fully charge an empty battery. Red light on the charger indicates charging; green light indicates full charge. Before use, connect the attached ground wire plug at the tail end, and clamp the ground clip to the earth.
2. According to the installation height of the counter, appropriately extend the telescopic discharge rod.
3. Press the red button to turn on high voltage for about 1 second, the indicator light will be on (slightly flashing), then gently tap the connection end of the counter and lightning arrester for testing.
4. After each tap, the discharge rod tip should leave the counter. If repeated testing is needed, you don't need to release the button. After about 1-2 seconds when the indicator light flashes again, you can tap again for testing.
5. Continuous testing will cause the tester to heat up, please pay attention to appropriate intervals.
6. If the indicator light does not flash after pressing the button for more than 3 seconds, it indicates that the battery needs charging.
7. Do not disassemble the tester arbitrarily. If the battery capacity drops significantly or charging efficiency is too low, it needs replacement. Please purchase a dedicated battery pack from our company.
Note: When the indicator light is on (slightly flashing), no part of the body should touch the electrode part, otherwise there is a risk of electric shock.
Rent and Sell 1000V Lightning Counter Tester Manufacturer Supply
1. Portable design, small size and light weight;
2. Telescopic electrode can adjust length according to height;
3. AC/DC dual power supply, built-in rechargeable battery, one charge can last for half a year;
4. Strong anti-interference ability;
5. Maximum voltage 1500V.

Note: The above information and technical parameters are compiled and released by Yangzhou Darui Electric Co., Ltd.